HOME CONSTRUCTION
IN PARAGUAY
Your home, just as you imagine it
Complete design and construction, using the 3D Panel System or traditional construction, to create efficient, comfortable and durable homes.
Homes adapted
to your lifestyle.
We take care of the entire
process.
We support you
at every stage.
High-quality materials
and workmanship.
A HOME DESIGNED FOR EACH CLIENT
Every home responds to a different way of living, site, set of needs and budget.
We build homes in Paraguay, combining design, functionality and quality with the construction system best suited to each client.
CONTEMPORARY HOMESModern, functional and efficient designs.
TRADITIONAL HOMESSolid and timeless solutions.
COUNTRY HOMESIntegrated with their surroundings and nature.From project to reality
A clear, organised path to make your home a reality.
01your needs
We listen to your ideas, analyse the site and define the type of home you need.
02your home
We develop the architectural solution that best suits your needs and possibilities.
03and select
We prepare a detailed quotation, define the construction schedule and select the materials.
04manage the work
We carry out the work with our team, with continuous follow-up and quality control.
05hand over
Ready to enjoy, with everything completed down to the last detail.
THE RIGHT CONSTRUCTION SYSTEM FOR EACH PROJECT
HOME CONSTRUCTION
TRADITIONAL
We carry out conventional construction adapted to the characteristics of each project, with quality materials and technical management at every stage.
3D PANEL SYSTEM
A modern, fast and versatile solution with high strength, thermal insulation and excellent structural performance.
Learn about the 3D Panel System →HOME CONSTRUCTION BUILT ON SOLID FOUNDATIONS
Every home requires rigorous planning, proper material selection and continuous follow-up during construction. At Construcción Integral EAS, we take care of every stage of the construction process to achieve a solid, functional and durable result.
Projects that speak for themselves
Homes of different styles, sizes and characteristics to suit different ways of living.





Before building
We answer your main questions.
01What is the price difference between building a home with traditional construction and the 3D Panel System?
The main cost difference lies in the structural shell, since the installations and finishes of the same home are essentially the same regardless of the construction system chosen.
The 3D Panel System uses higher-performance materials, so its material cost is higher than traditional masonry. This difference is partially offset by much faster execution and lower labour requirements.
As a reference, constructing one m² of wall with 3D Panel can require 10 times less labour time than a traditional brick wall, allowing the structural shell schedule to be reduced by approximately 30% to 40%.
Therefore, the choice should not be made solely by comparing the initial price. 3D Panel provides greater strength and thermal insulation while also considerably reducing construction times.
At Construcción Integral EAS we can study both alternatives for the same project and explain the differences in cost, schedule and performance before the client chooses the construction system.
02How much does it cost to build a home?
We do not work with a fixed construction cost because every home has a different design, characteristics and requirements.
Once the architectural solution is defined, we prepare a detailed construction budget considering the selected materials and their market prices, the labour required according to the construction schedule, installations, structural elements, construction costs and the company's operating margin.
With this information we present a budget tailored to the project and the client's possibilities. It can be reviewed and adapted through material selection, construction solutions and other project decisions until the right balance between needs, quality and budget is achieved.
03How long does it take to build a home?
Construction time depends mainly on floor area, project characteristics, construction system, level of finishes and the complexity of the home.
As a reference, an economical home of about 50 m² can be built in approximately 2 to 3 months.
A larger and more complex home—for example, 200 m² over two floors, with terraces, garden and a pool of about 30 m²—may require approximately 12 months with traditional construction and around 8 months using the 3D Panel System.
The difference occurs mainly during the structural shell stage, which can be considerably faster with 3D Panel. Subsequent installations and finishes are essentially the same in both systems.
Before starting each project, we establish a construction schedule adapted to the project, allowing the different stages to be planned and monitored through completion.
04Can you handle the design and complete construction through to handing over the finished home?
Yes. We can develop the design and carry out the complete construction, or work from an existing project. We also undertake partial contracts.
05What do I need to get started if I do not yet have a design?
We can start from your ideas, needs and the site. Together we analyse the type of home, floor area, spaces, style, construction system and investment possibilities.
We design the architectural solution that meets your expectations, prepare the budget, plan the work and build your home.
Let's build
your next home
Your home begins with an idea, a need or a life project. At Construcción Integral EAS, we want to accompany you on the journey to turn that idea into reality.
Tell us what you want to build. We will study the most suitable alternatives and solutions with you to develop your project through to the finished home.
Invite us to be part of your project. Let's build it together.
